Loading...
Loading Data...
| ID | Final | Division | District | Bridge Name | Struct Type | Bridge Type | Loding | Const. Year | Length(m) | Width(m) | Road ID | Road Name | Road Chainage | Rating | Rating Date | Intersected | Nearest town | Road Type | Work Code(s) | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 110 |
|
PD Ranikhet | Almora | Khairna Bridge | Truss | Motor Bridge High Level | Class B | 1887 | 64.92 | 4.750 | 52 | Khairna Ranikhet Ramnager state highway | 0.038 |
0.00 % |
06-06-2026 | Koshi River | Khairna | SH | -- | |
| 357 |
|
PD Ranikhet | Almora | Bhatrojkhan Jeenapani Bridge Km 14 | Solid slab | Road Over Bridge | Class A | 2013 | 24.00 | 5.500 | 702 | Bhatrojkhan Jeenapani motor road | 13.162 |
0.26 % |
12-06-2026 | Magruwa Gadhara (Local Gadhara) (Rodhana Gadhara) | Bhatrojkhan | ODR | -- | |
| 601 |
|
PD Ranikhet | Almora | Anedi bridge | Suspension | Pedestrain Bridge | Footpath Live Load | 1970 | 60.33 | 2.000 | -- | None | 0.030 |
0.40 % |
16-05-2026 | Ramganga river | Anedi | -- | -- | |
| 602 |
|
PD Ranikhet | Almora | Dyona Bridge | Suspension | Pedestrain Bridge | Footpath Live Load | 1991 | 70.00 | 2.000 | -- | None | 0.035 |
1.33 % |
01-06-2026 | Ramganga river | Dyona | -- | -- | |
| 610 |
|
PD Ranikhet | Almora | Tipola Bridge | Truss | Motor Bridge High Level | Class B | 1990 | 48.00 | 4.750 | 5726 | Soni Dayodakhal Silor kunsyari Tipola Badet Kafda motor road | 30.024 |
10.73 % |
13-02-2026 | Gagas River | Village Tipola | MDR | -- | |
| 829 |
|
PD Ranikhet | Almora | Over Ramganga River | Truss | Motor Bridge High Level | Class B | 1976 | 55.00 | 5.250 | 28 | Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway | 0.200 |
12.20 % |
01-06-2026 | Ramganga River | Bhikysain | SH | ADB | |
| 879 |
|
PD Ranikhet | Almora | Over Masali Gadhera | T-beam and slab | Motor Bridge High Level | Class B | 1991 | 18.30 | 5.250 | 28 | Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway | 2.850 |
15.96 % |
28-05-2026 | Over Masali Gadhera | Bhikysain | SH | ADB | |
| 881 |
|
PD Ranikhet | Almora | RCC Bridge Over Local Gadhera | Solid slab | Motor Bridge High Level | Class B | 1990 | 6.00 | 5.250 | 28 | Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway | 3.615 |
21.03 % |
28-05-2026 | Over Local Gadhera | Bhikysain | SH | ADB | |
| 882 |
|
PD Ranikhet | Almora | RCC Bridge Over Airari Gadhera | T-beam and slab | Motor Bridge High Level | Class B | 1965 | 10.00 | 5.250 | 28 | Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway | 5.910 |
18.81 % |
28-05-2026 | Over Airari Gadhera | Bhikysain and Syalde | SH | ADB | |
| 883 |
|
PD Ranikhet | Almora | Steel Truss Bridge Over Khatron River | Truss | Motor Bridge High Level | Class B | 1978 | 36.58 | 5.500 | 28 | Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway | 7.890 |
9.38 % |
01-06-2026 | Steel Truss Bridge Over Khatron River | Syaldey | SH | ADB | |
| 887 |
|
PD Ranikhet | Almora | Over Local Gadhera at Timla | Solid slab | Motor Bridge High Level | Class B | 1988 | 6.00 | 5.500 | 28 | Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway | 14.320 |
11.45 % |
28-05-2026 | Over Local Gadhera at Timla | Syaldey | SH | ADB | |
| 888 |
|
PD Ranikhet | Almora | Over Local Gadhera Taminagar | Solid slab | Motor Bridge High Level | Class B | 1978 | 6.00 | 5.500 | 28 | Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway | 15.785 |
3.12 % |
28-05-2026 | Over Local Gadhera Taminger | Syaldey | SH | ADB | |
| 889 |
|
PD Ranikhet | Almora | Over Local Gadhera Bhakura | Solid slab | Motor Bridge High Level | Class B | 1988 | 7.50 | 5.500 | 28 | Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway | 19.340 |
5.39 % |
28-05-2026 | Over Local Gadhera Bhakura | Syaldey | SH | ADB | |
| 890 |
|
PD Ranikhet | Almora | Dobri Gadhera | T-beam and slab | Motor Bridge High Level | Class B | 1998 | 12.50 | 5.500 | 28 | Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway | 21.050 |
5.58 % |
28-05-2026 | Dobri Gadhera | Syaldey | SH | ADB | |
| 891 |
|
PD Ranikhet | Almora | Walmara Gadhera | Solid slab | Motor Bridge High Level | Class B | 1998 | 6.00 | 5.500 | 28 | Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway | 22.680 |
3.36 % |
28-05-2026 | Walmara Gadhera | Syaldey | SH | ADB | |
| 892 |
|
PD Ranikhet | Almora | RCC bridge Over Local Gadhera Near Viral Gaon | Solid slab | Motor Bridge High Level | Class A | 2017 | 15.00 | 7.000 | 720 | Pasiya Pipna Motor Road at Jeepa Tanla Simlital Lachigard Jamirkhet to Dabra Motor Road | 9.325 |
0.36 % |
11-06-2026 | Sola Gadhera | Bajra Tela | VR | -- | |
| 893 |
|
PD Ranikhet | Almora | Baleshawar | Suspension | Pedestrain Bridge | Footpath Live Load | 2003 | 55.00 | 1.800 | -- | None | 0.000 |
0.00 % |
18-05-2026 | Baleshawar | Tipola | -- | -- | |
| 894 |
|
PD Ranikhet | Almora | RCC bridge Over Local Gadhera Near Viral Gaon | T-beam and slab | Motor Bridge High Level | Class A | 2017 | 21.00 | 6.800 | 720 | Pasiya Pipna Motor Road at Jeepa Tanla Simlital Lachigard Jamirkhet to Dabra Motor Road | 10.275 |
0.24 % |
11-06-2026 | Bhulbagad Gadhera | viral gaon | VR | -- | |
| 895 |
|
PD Ranikhet | Almora | RCC bridge Over Local Gadhera Near Kali Gaon | Solid slab | Motor Bridge High Level | Class A | 2017 | 10.00 | 7.000 | 720 | Pasiya Pipna Motor Road at Jeepa Tanla Simlital Lachigard Jamirkhet to Dabra Motor Road | 10.825 |
0.27 % |
11-06-2026 | Local Gadhera | Kali gaon | VR | -- | |
| 896 |
|
PD Ranikhet | Almora | RCC bridge Over Local Gadhera Near Kali Gaon | Solid slab | Motor Bridge High Level | Class A | 2018 | 8.00 | 6.100 | 720 | Pasiya Pipna Motor Road at Jeepa Tanla Simlital Lachigard Jamirkhet to Dabra Motor Road | 21.625 |
0.98 % |
11-06-2026 | Local Gadhera | Kali gaon | VR | -- | |
| 897 |
|
PD Ranikhet | Almora | Steel girder bridge Over Nerh Gadhara | Truss | Pedestrain Bridge | Footpath Live Load | 2012 | 15.00 | 2.500 | 720 | Pasiya Pipna Motor Road at Jeepa Tanla Simlital Lachigard Jamirkhet to Dabra Motor Road | 0.250 |
1.77 % |
14-07-2026 | Nerhl Gadhera | Bajra Tela | VR | -- | |
| 898 |
|
PD Ranikhet | Almora | over local gadhera at kumeriya | T-beam and slab | Motor Bridge High Level | Class B | 1986 | 16.00 | 4.250 | 52 | Khairna Ranikhet Ramnager state highway | 99.230 |
0.97 % |
15-06-2026 | Local Gadhera | kumeriya | SH | ADB | |
| 899 |
|
PD Ranikhet | Almora | Dhanoli Bridge | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 2017 | 15.00 | 2.000 | -- | None | 7.500 |
0.08 % |
10-07-2026 | naorad river | Dhanoli | -- | -- | |
| 909 |
|
PD Ranikhet | Almora | Lohali Bridge | Suspension | Pedestrain Bridge | Footpath Live Load | 2002 | 60.00 | 1.800 | -- | None | 0.000 |
2.86 % |
06-06-2026 | Lohali Bridge over Koshi River | Lohali | -- | -- | |
| 910 |
|
PD Ranikhet | Almora | kaligar Bridge | T-beam and slab | Motor Bridge High Level | Class B | 1980 | 19.00 | 3.750 | 52 | Khairna Ranikhet Ramnager state highway | 5.900 |
0.00 % |
01-06-2024 | Kaligar Gadhera | tarikhet | SH | ADB | |
| 912 |
|
PD Ranikhet | Almora | Kunigarh Local Gadhera | Solid slab | Motor Bridge High Level | Class B | 2003 | 6.00 | 7.000 | 685 | Tarikhet Pipli Manjurkhan motor road | 1.136 |
2.38 % |
07-08-2024 | Kunigarh Local Gadhera | Tarikhet | MDR | -- | |
| 914 |
|
PD Ranikhet | Almora | Sirot Local Gadhera | T-beam and slab | Motor Bridge High Level | Class B | 2008 | 7.00 | 4.800 | 251 | Ganiydholi Tana Visalkote motor road | 6.030 |
0.00 % |
06-07-2026 | Sirot Local Gadhera | Ganiyadeoli | ODR | -- | |
| 965 |
|
PD Ranikhet | Almora | Badhangar Gadhera | T-beam and slab | Motor Bridge High Level | Class B | 2003 | 18.00 | 4.270 | 62 | Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway) | 0.200 |
0.75 % |
01-10-2026 | Badhangar Gadhera | Marchula | SH | ADB | |
| 968 |
|
PD Ranikhet | Almora | Badhangar Bridge | Cable stayed | Pedestrain Bridge | Footpath Live Load | 2003 | 60.00 | 1.830 | -- | None | 0.000 |
0.94 % |
17-07-2026 | Over Badhangar River | Hinola | -- | -- | |
| 970 |
|
PD Ranikhet | Almora | Devta Gadhera | Truss | Motor Bridge High Level | Class B | 1967 | 86.87 | 4.750 | 96 | Thalisain Bhungidhar Deghat Jainal Manila Dotiyal Marchula state highway | 134.627 |
0.27 % |
01-10-2026 | Devta Gadhera | Marchula | SH | ADB | |
| 982 |
|
PD Ranikhet | Almora | Suspension bridle bridge Over Ramganga River at near Devradi | Suspension | Pedestrain Bridge | Footpath Live Load | 1998 | 90.00 | 2.700 | 721 | Bhikiyasain to Thapla Motor Road | 2.580 |
0.30 % |
18-06-2026 | Ramganga River | Thapla | VR | -- | |
| 983 |
|
PD Ranikhet | Almora | Suspension bridle bridge Over Ramganga River at near Bhikiyasan Near Shiv Mandir | Suspension | Pedestrain Bridge | Footpath Live Load | 1968 | 100.00 | 2.050 | 247 | Bhattigauv Qwairali motor road | 4.500 |
0.00 % |
08-07-2026 | Ramganga River | Bhikiyasan | VR | -- | |
| 984 |
|
PD Ranikhet | Almora | Suspension bridle bridge Over Ramganga River at near Near Digolibabagh | Suspension | Pedestrain Bridge | Footpath Live Load | 1966 | 67.05 | 2.050 | 721 | Bhikiyasain to Thapla Motor Road | 5.250 |
0.00 % |
09-07-2026 | Ramganga River | Thapla | VR | -- | |
| 985 |
|
PD Ranikhet | Almora | Naurad Naala | Suspension | Motor Bridge High Level | NA | 2014 | 48.00 | 4.800 | 248 | Bhikiyasain Basot Ghatti motor road | 20.670 |
0.00 % |
12-06-2026 | Naurad Naala | Bhikiyasan | MDR | -- | |
| 986 |
|
PD Ranikhet | Almora | R.C.C T-Beam bridge Over Chala Gadhara | T-beam and slab | Motor Bridge High Level | Class B | 1980 | 15.00 | 6.000 | 96 | Thalisain Bhungidhar Deghat Jainal Manila Dotiyal Marchula state highway | 73.850 |
0.15 % |
08-07-2026 | Chala Gadhera | Jainal | SH | ADB | |
| 1021 |
|
PD Ranikhet | Almora | Local Gadhera at Kumeria | Solid slab | Motor Bridge High Level | Class B | 1980 | 7.00 | 4.750 | 52 | Khairna Ranikhet Ramnager state highway | 101.540 |
1.23 % |
02-06-2026 | Local Gadhera at Kumeria | Kumeria | SH | ADB | |
| 1022 |
|
PD Ranikhet | Almora | Local Gadhera at Saural | T-beam and slab | Motor Bridge High Level | Class B | 1980 | 7.00 | 4.750 | 52 | Khairna Ranikhet Ramnager state highway | 99.980 |
1.84 % |
02-06-2026 | Local Gadhera at Saural | Saural | SH | ADB | |
| 1023 |
|
PD Ranikhet | Almora | Chaudarola bridge | T-beam and slab | Motor Bridge High Level | Class B | 1978 | 14.00 | 4.230 | 62 | Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway) | 68.220 |
0.39 % |
08-07-2026 | chaudrola gadhera | kulanteswer | SH | ADB | |
| 1025 |
|
PD Ranikhet | Almora | jalikhan bridge | T-beam and slab | Motor Bridge High Level | Class B | 1990 | 7.00 | 4.230 | 62 | Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway) | 1.000 |
0.12 % |
08-07-2026 | jalikhan gadhera | Ekukhet | SH | ADB | |
| 1080 |
|
PD Ranikhet | Almora | Local Gadhera at Saural | Solid slab | Motor Bridge High Level | Class B | 1996 | 7.00 | 4.750 | 52 | Khairna Ranikhet Ramnager state highway | 98.340 |
1.86 % |
02-06-2026 | Local Gadhera at Saural | Saural | SH | ADB | |
| 1082 |
|
PD Ranikhet | Almora | Local Gadhera at Saural | Solid slab | Motor Bridge High Level | Class B | 1952 | 27.00 | 4.750 | 52 | Khairna Ranikhet Ramnager state highway | 104.540 |
1.24 % |
15-06-2026 | Local Gadhera at Saural | Saural | SH | ADB | |
| 1684 |
|
PD Ranikhet | Almora | Khalduwa over Mashangari River | Solid slab | Motor Bridge High Level | Class B | 2010 | 48.00 | 4.270 | 257 | Deghat Khalduwa Motor Road | 1.900 |
3.32 % |
01-06-2026 | Mashangari River | Ganga Nagar | ODR | -- | |
| 1685 |
|
PD Ranikhet | Almora | Baratiya Bridge | Solid slab | Motor Bridge High Level | Class A | 2019 | 36.00 | 4.270 | 28 | Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway | 1.900 |
0.32 % |
16-07-2026 | Vinod River | Ghatgar | SH | -- | |
| 1686 |
|
PD Ranikhet | Almora | Golna Bridge | Box girder | Motor Bridge High Level | Class B | 2021 | 72.00 | 4.270 | 257 | Deghat Khalduwa Motor Road | 0.150 |
1.85 % |
01-06-2026 | Mashangari River | Deghat | ODR | -- | |
| 1687 |
|
PD Ranikhet | Almora | Balley Bridge | Bailey | Motor Bridge High Level | Class B | 1993 | 42.00 | 4.250 | 257 | Deghat Khalduwa Motor Road | 0.150 |
11.61 % |
01-06-2026 | Vinod River | Deghat | ODR | -- | |
| 1688 |
|
PD Ranikhet | Almora | Bhaisora | Truss | Motor Bridge High Level | Footpath Live Load | 2014 | 24.00 | 2.000 | 745 | Bajkhet Turachora Bahsora motor road | 0.010 |
11.45 % |
14-07-2026 | Dhul Gadhera | Bajkhet | VR | -- | |
| 1689 |
|
PD Ranikhet | Almora | Kedar Bridge | Suspension | Motor Bridge High Level | Footpath Live Load | 1967 | 97.54 | 1.830 | 708 | Walmara Syalde Kedar motor road | 0.050 |
20.98 % |
29-05-2026 | Ramganga River | Syaldey | VR | -- | |
| 1690 |
|
PD Ranikhet | Almora | Tamadhon | Suspension | Pedestrain Bridge | Footpath Live Load | 1984 | 88.00 | 1.830 | -- | None | 0.000 |
4.76 % |
29-05-2026 | Vinod River | Balmara | -- | -- | |
| 1691 |
|
PD Ranikhet | Almora | Kedar Bridge | Suspension | Motor Bridge High Level | Footpath Live Load | 1971 | 72.00 | 1.830 | 708 | Walmara Syalde Kedar motor road | 14.850 |
0.62 % |
29-05-2026 | Vinod River | Syaldey | VR | -- | |
| 1692 |
|
PD Ranikhet | Almora | Narmadeshwar | Truss | Motor Bridge High Level | Footpath Live Load | 2014 | 75.00 | 1.830 | 708 | Walmara Syalde Kedar motor road | 0.036 |
13.47 % |
29-05-2026 | Vinod River | Syaldey | VR | -- | |
| 1693 |
|
PD Ranikhet | Almora | Pedestrain Bridge at Deghat | Suspension | Pedestrain Bridge | Footpath Live Load | 1968 | 90.00 | 1.830 | 257 | Deghat Khalduwa Motor Road | 0.045 |
5.30 % |
01-06-2026 | Mashangari River | Ganga Nagar | ODR | -- | |
| 1694 |
|
PD Ranikhet | Almora | Bridge at Patharkhola | Suspension | Pedestrain Bridge | Footpath Live Load | 1991 | 36.00 | 1.830 | -- | None | 0.000 |
19.87 % |
29-05-2026 | Vinod River | Patharkhola | -- | -- | |
| 1695 |
|
PD Ranikhet | Almora | Bridge at Chauripipal over Vinod River | Suspension | Pedestrain Bridge | Footpath Live Load | 2005 | 81.00 | 2.000 | -- | None | 0.000 |
20.09 % |
29-05-2026 | Vinod River | Kotesyari | -- | -- | |
| 1696 |
|
PD Ranikhet | Almora | Ghatgar Bridge | Truss | Pedestrain Bridge | Footpath Live Load | 2012 | 36.00 | 1.830 | -- | None | 0.000 |
3.90 % |
16-07-2026 | Vinod River | Ghatgar | -- | -- | |
| 1697 |
|
PD Ranikhet | Almora | Ranthamal | Truss | Pedestrain Bridge | Footpath Live Load | 2014 | 24.00 | 2.000 | 5717 | Road from km 2 of Deghat Chintoli motor road to Upradi | 0.012 |
1.17 % |
16-07-2026 | Gaya Gadhera | Khulduwa | VR | -- | |
| 2914 |
|
PD Ranikhet | Almora | Steel Girder Motor Bridge | Truss | Motor Bridge High Level | Class B | 2021 | 30.00 | 5.000 | 708 | Walmara Syalde Kedar motor road | 0.550 |
3.52 % |
29-05-2026 | Dobri Gadhera | Udaypur | VR | -- | |
| 2915 |
|
PD Ranikhet | Almora | RCC Bridge | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 1960 | 14.20 | 2.200 | -- | None | 0.000 |
4.83 % |
14-07-2026 | Khatron River | Faniya | -- | -- | |
| 3270 |
|
PD Ranikhet | Almora | Bhagatia | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 2002 | 70.00 | 1.830 | 727 | Gagas Udi Mahadevv Selapani Bhikiyasain Marchula Motor Road | 0.000 |
1.27 % |
17-07-2025 | Ramganga | Bhagatia | VR | -- | |
| 3519 |
|
PD Ranikhet | Almora | Sauni Bridge | Arch | Motor Bridge High Level | Class B | 1950 | 17.00 | 4.500 | 52 | Khairna Ranikhet Ramnager state highway | 47.006 |
0.00 % |
24-06-2026 | Local Gadhera (Kunigard) | Sauni | SH | ADB | |
| 3520 |
|
PD Ranikhet | Almora | Katolarola Bridge | T-beam and slab | Motor Bridge High Level | Class B | 1950 | 7.00 | 4.250 | 62 | Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway) | 71.005 |
0.56 % |
08-07-2026 | katorola gadhra | Saraikhet | SH | ADB | |
| 3521 |
|
PD Ranikhet | Almora | Babliya gadhera | T-beam and slab | Motor Bridge High Level | Class B | 1988 | 10.90 | 4.500 | 28 | Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway | 26.125 |
8.57 % |
28-05-2026 | Babaliya Gadhera | Patharkhola | SH | ADB | |
| 3635 |
|
PD Ranikhet | Almora | sodhar panwadhokan | Truss | Motor Bridge High Level | Class A | 2016 | 60.00 | 6.000 | 5879 | Saudhar Panuwadhyokhan Motor Road | 12.350 |
0.81 % |
09-07-2026 | vankota gadhera | panwadhokan | VR | -- | |
| 3655 |
|
PD Ranikhet | Almora | pastorawar bridge | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 2013 | 12.00 | 2.000 | -- | None | 0.012 |
0.00 % |
13-07-2026 | kaligard gadhera | chamarkhan | -- | -- | |
| 3656 |
|
PD Ranikhet | Almora | kedar bridge | T-beam and slab | Motor Bridge High Level | Class B | 2020 | 105.00 | 4.500 | 708 | Walmara Syalde Kedar motor road | 15.100 |
2.88 % |
29-05-2026 | vinod river | kedar | VR | -- | |
| 3657 |
|
PD Ranikhet | Almora | ganiyadholi pali nadoli bridge | T-beam and slab | Motor Bridge High Level | Class B | 2018 | 11.50 | 5.950 | 1734 | Ganiadholi Pali Naduli motor road to Km 3 Dholandhar motor road : . | 1.825 |
6.76 % |
09-07-2026 | karitab gadhera | jhakholi | VR | -- | |
| 3662 |
|
PD Ranikhet | Almora | kane khalpati bridge | Truss | Motor Bridge High Level | Class A | 2023 | 70.00 | 5.150 | 747 | Hinola Kane Khalpati motor road | 14.000 |
0.06 % |
01-06-2026 | ramganga river | nail pinakot | VR | -- | |
| 3664 |
|
PD Ranikhet | Almora | tarar bridge | T-beam and slab | Motor Bridge High Level | Class A | 2024 | 18.00 | 6.500 | 727 | Gagas Udi Mahadevv Selapani Bhikiyasain Marchula Motor Road | 18.000 |
0.34 % |
17-07-2025 | tarar gadhera | tarar | VR | -- | |
| 3665 |
|
PD Ranikhet | Almora | chamar bridge | Solid slab | Motor Bridge High Level | Class A | 2025 | 12.00 | 6.500 | 727 | Gagas Udi Mahadevv Selapani Bhikiyasain Marchula Motor Road | 7.050 |
0.00 % |
17-07-2025 | chamar gadhera | matwas | VR | -- | |
| 3666 |
|
PD Ranikhet | Almora | badikot bridge bhikyasain | Truss | Motor Bridge High Level | Class A | 2023 | 84.00 | 6.700 | 727 | Gagas Udi Mahadevv Selapani Bhikiyasain Marchula Motor Road | 36.000 |
0.00 % |
08-06-2026 | ramganga river | bhikyasain | VR | -- | |
| 3667 |
|
PD Ranikhet | Almora | Anedi motor bridge | Plate Girder | Motor Bridge High Level | Class A | 2023 | 36.00 | 7.000 | 727 | Gagas Udi Mahadevv Selapani Bhikiyasain Marchula Motor Road | 20.000 |
0.82 % |
17-07-2025 | ramganga river | Anedi | VR | -- | |
| 3668 |
|
PD Ranikhet | Almora | narmedeswar bridge | Plate Girder | Pedestrain Bridge | Footpath Live Load | 1968 | 46.00 | 2.000 | -- | None | 1.000 |
20.45 % |
29-05-2026 | vinod river | talai | -- | -- | |
| 3669 |
|
PD Ranikhet | Almora | Asutale bridge over baikna gadhera | Truss | Motor Bridge High Level | Class A | 2023 | 48.00 | 5.500 | 722 | Pipna Manhat Dangula Motor Road | 7.000 |
0.15 % |
11-06-2026 | Baikna gadhera | Asutale | VR | -- | |
| 3680 |
|
PD Ranikhet | Almora | Patirola bridge | Solid slab | Motor Bridge High Level | Class B | 2024 | 12.00 | 5.800 | 707 | Maharoli Chitodkhal Motor Road | 6.900 |
0.44 % |
16-07-2026 | Patirola gadhera | kantarithor | VR | -- | |
| 3681 |
|
PD Ranikhet | Almora | Lakhora bridge | Truss | Motor Bridge High Level | Class B | 2023 | 24.00 | 5.800 | 5711 | Kargil Saheed Anand Singh Rawat's Village Giwaipani Motor Road | 0.375 |
0.19 % |
16-07-2026 | Lakhora Ghadhera | Chitorkhal | VR | -- | |
| 3682 |
|
PD Ranikhet | Almora | Hasli bridge | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 2017 | 8.80 | 2.200 | -- | None | 0.000 |
0.13 % |
16-07-2026 | Local gadhera | Hasli | -- | -- | |
| 3683 |
|
PD Ranikhet | Almora | Sarso bridge | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 2017 | 10.70 | 2.200 | -- | None | 0.000 |
0.16 % |
16-07-2026 | Local Gadhera at Sarso | Sarso | -- | -- | |
| 3687 |
|
PD Ranikhet | Almora | Masangarhi bridge | Truss | Pedestrain Bridge | Footpath Live Load | 2023 | 60.00 | 4.000 | -- | None | 0.000 |
0.00 % |
16-07-2026 | Masangarhi river | Khaldua | -- | -- | |
| 3697 |
|
PD Ranikhet | Almora | Ramsingh kichar Tuligard bridge | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 2011 | 18.00 | 2.400 | -- | None | 0.000 |
3.39 % |
16-07-2026 | Tuligarh River | Tuligard | -- | -- | |
| 3698 |
|
PD Ranikhet | Almora | Juniyarola Bridge | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 2017 | 18.00 | 2.000 | -- | None | 0.000 |
11.94 % |
31-05-2026 | Dobri Gadhera | Pilkhi udeypur | -- | -- | |
| 3699 |
|
PD Ranikhet | Almora | Katron bridge | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 2022 | 18.00 | 2.400 | -- | None | 0.000 |
0.15 % |
17-07-2026 | khatron river | Metela gumti | -- | -- | |
| 3700 |
|
PD Ranikhet | Almora | Grarkhet khuchiyachon bridge | T-beam and slab | Pedestrain Bridge | Footpath Live Load | 2022 | 16.00 | 2.400 | -- | None | 0.000 | Khatron river | Malla metela | -- | -- | |||
| 3713 |
|
PD Ranikhet | Almora | Bajkhet bridge over dotiyal gadhera | T-beam and slab | Motor Bridge High Level | Class B | 2015 | 8.00 | 6.500 | 717 | Bajkhet Kankote Toolbhudani Motor Road | 0.250 |
0.19 % |
17-07-2026 | Dotiyal Nala | Bajkhet | VR | -- |